Home > Blog > [CASE STUDY] 288 Albert – Brunswick

[CASE STUDY] 288 Albert – Brunswick

Project / 288 Albert
Location / 284-294 Albert St, Brunswick
Floor Count / 14

 

Over 1000 L/M of Smart Hobs were used on this 14 level project, replacing the conventional on site construction of timber hob formwork.

Returning to strip timber form ply and patch damaged hobs once concrete has set requires considerable time, effort and labour. Once installed, Smart Hobs form a permanent system, removing those steps entirely from the hob formwork construction process. Using the Smart Hob system, each level can be completed and handed over faster.

Smart Hobs…easier, smarter and faster.